20. The developer supplies the association with the copies of the certificates of occupancy ___________. A. as he gets them B. when he thinks they need them C. at transition D. when asked for them {Ans: C. at transition Within 90 days of when the members are entitled to elect a majority of the Board, the developer, at his expense, must turn over all of the property and official records to the association. This includes the association building plans used in the construction of the building, warranties, a list of contractors, sub-contractors, and suppliers, a copy of the certificate of occupancy and all permits applicable to the properties. An audit from inception to turnover date must be conducted at the developer's expense and an architect's or engineer's turnover inspection report shall be turned over by the Developer attesting to the required maintenance, useful life, and replacement costs of certain common elements listed in the statute.}62. Upon the request of a unit owner, the Board of Directors must deliver a Certificate of Status of Assessments within ____ days. A. five B. ten C. fifteen D. twenty {Ans: C. fifteen In condominiums and cooperatives the Board must be prepared to