COMPARATIVE ANALYSIS OF OLD AND NEW METHODS OF COMPENSATION AND SCHEDULE OF FEES Minimum Basic Fee (1979 SPP Method of Compensation) The schedule of charges herein indicated are to be considered as the Minimum Basic Fee since the Architects charges also take into consideration his professional standing in the community. Recommended Professional Fee (2016 Architect's Guidelines dor SPP Compliances) Professional Architectural Work is classified in accordance with the degrees of complexity and the creative skill required to meet the requirements of the Client with technical, functional, economic, and aesthetic constraints. Manner of Providing Services Whether the arrangement chosen is DAEDS or DADS, the professional responsibilities and civil liabilities of each State-regulated professional remain separate. METHODS OF COMPENSATION SPP DOC METHODS OF COMPENSATION (2016 Architect's Guidelines for SPP Compliances) SPP Doc 201 (Pre-Design Services) a) Multiple of Direct Personnel Expense b) Professional Fee Plus Expenses c) Lump Sum or Fixed Fee d) Per Diem, Honorarium Plus Reimbursable Expenses e) Mixed Methods of Compensation SPP Doc 202 (Regular Design Services) a) Percentage (%) of Project Construction Cost (PCC) b) Unit Cost Method based on Project Construction Cost c) Professional Fee plus Expenses d) Lump Sum or Fixed Fee e) Per Diem. Honorarium