RCDD Practice EXAM 2025 QUESTIONS AND CORRECT ANSWER All of the following are true about the post construction phase EXCEPT: A. The owner is responsible to update the record copy drawings to reflect "as-built" documents. B. The contractors are resolving issues identified on the punch lists. C. The architect is involved in final acceptance and contract closeout activities. D. The construction manager is coordinating removal of construction equipment and job trailers. - answer>>>A If the input signal power to a communication system is 1 W and the output power is 1 mW, the system attenuation is: A. 3 dB B. 20 dB C. 30 dB D. 40 dB E. 1000 dB - answer>>>C What is the PERT estimate (in hours) for project design where:- Optimistic time is 40 hours- Most likely time is 50 hours- Pessimistic time is 60 hours A. 40 hours B. 45 hours C. 50 hours D. 55 hours E. 60 hours - answer>>>C A building has six floors plus a basement. Each floor is 10,000 square feet and has approximately 50 CATV outlets respectively. There is a single hardline trunk cable installed from the basement headend passing through the telecommunications room (TR) on each floor. What