NERC SOS PRE-ASSESSMENT /PRE-TEST 2024/2025 /COMPLETE ACTUAL 146 EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+. What are three primary AGC control models? - ANSWER-Tie-Line Bias, Constant Frequency, Constant Net Interchange When a balancing Authority's ACE is zero, what is true? - ANSWER- The BA load-interchange-generation balancing while supporting Interconnection Frequency In a 3-phase AC generator... - ANSWER-Each phase is physically offset by 120 degrees Inductance is a property of an electric circuit that opposes the change in ___ - ANSWER-current What three values are included in OHM's Law? - ANSWER-Volts, Amps, impedance You dispatch a field crew to a substation to help determine the reason for a transmission line trip. What is the first thing you are going to ask them to do? - ANSWER-Read Targets When energizing a long, HV transmission line from one end, what would you expect to see on the open end of the line? - ANSWER- Higher Voltage than the closed endWhat is inadvertent? - ANSWER-The difference between actual and scheduled interchange What is a balancing area between the source and sink balancing areas called? - ANSWER-Intermediary Balancing Area What does AGC stand for? - ANSWER-Automatic Generation Control When implementing an interchange