Completion {Ans: When all of the following have occurred: 1. The Work has been satisfactorily completed in all respects according to the Contract. 2. The Project is ready for use by the Department as required by the Contract. 3. The Contractor has satisfactorily executed and delivered to the RE all documents, certificates, and proofs of compliance required by the Contract including the Notice of Completion.}Bidder {Ans: The individual, firm, partnership, corporation, joint venture, or any acceptable combination thereof that submits a bid to the Department.}acceptance testing {Ans: Testing conducted by the Department to measure the degree of compliance to the Contract}addendum {Ans: A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids.}bridge length {Ans: The overall length measured along the line of survey stationing from back to back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no case less than the total clear opening of the structure}Project Limits {Ans: These are shown on the key sheet and modified as follows: 1. The areas of construction operations and areas used by the Contractor to perform the work. If only