A construction manager has been engaged to assist in replacement of the physiological monitors in an inpatient unit. The new monitors require that communication cables be replaced. A meeting must be called to determine the requirements for the cable replacement project. The project requirements meeting should include the head nurse, the hospital project manager, and which of the following? A. IT department only B. hospital safety officer only C. IT department and infection control D. hospital safety officer and biomedical engineer {Ans: C. At a minimum, these perspectives must be addressed when planning replacement of the monitors. The IT department understands the impact on the overall network system, and infection control brings a patient safety perspective (on this unit and in nearby areas).}According to the 2014 FGI Guidelines for the Design and Construction of Hospitals and Outpatient Facilities, "clean to dirty" refers to A. air flow. B. water flow. C. oxygen systems. D. vacuum systems. {Ans: A. This is the correct answer based upon the Guidelines for the Design and Construction of Hospitals and Outpatient Facilities.}Assuming all Interim Life Safety Measures (ILSM) listed below were put into place during a hospital renovation project, which of the following are