true {Ans: T or F: When wiring a TAKE 345, you must ensure that has 3 points of ground; the low side of each zone, the takeover module, and the power supply}Which of the following zone/sensor types are correct when programming an SMKT3? Type 9 - Freeze Detect Type 7 - Freeze Detect Type 9 - Heat detect Type 6 - heat detect type 1 - heat detect type 8 - freeze detect type 5 - smoke detect type 7 - smoke detect type 9 - smoke detect {Ans: }How many stages of heat does a conventional unit with a furnace have it it has both W and W2 wires? 2 stage 3 stage 4 stage 1 stage {Ans: }3/4" {Ans: When installing a DW21, what size bit should you use to drill the hole for the sensor? 1/2" 3/8" 3/4" 1"}T or F: The Firefighter may be installed next to a stand-alone battery-powered smoke detector {Ans: }Determine HVAC setup based on the following wiring: C, W, Y, Y2, Rc, G Heat Pump, AC powered, 2 stage pump, 1 Aux heat Conventional, Battery powered, 2 stage cool, 2 stage heat Conventional, AC powered, 2 stage