Your installation is increasing the NEW for a storage site built in 1969 and storing a hazard division that was not previously approved for that location. Do you need to complete an ESSP? {Ans: Yes, and it requires DDESB approval.}Failing to submit a successful ESSP may result in... {Ans: reduced operational capacity.}The Expedited Approval Request must... {Ans: explain why an expedited approval is required.}Who is authorized to sign an ESSP transmittal memorandum? {Ans: Installation Commander or designated representative}You must submit an ESSP for DDESB approval if the installation is... {Ans: building an ES within an existing ESQD arc.}Intraline distance (ILD) is the minimum distance permitted between... {Ans: two operating buildings.}As distance from the potential explosion site decreases, the potential for damage to an exposed site from an explosion.... {Ans: increases.}Which are the phases of the ESSP process in order? {Ans: Development and Evaluation, Submission, DDESB Review, and Implementation.}Which is NOT a common mistake when submitting an ESSP? {Ans: Sending the ESSP to USATCES}The purpose of an ESSP is to ensure safety, provide specifications, and... {Ans: establish limits.}Which ESSP category addresses PES and ES that do not meet the deterministic QD