What constitutes a measurable rain event according to GP? {Ans: 0.25 in. or more over 24 hours.}what are some activities exempt from SWM regulations? {Ans: mining, agriculture, sewer discharges, local reclamation programs, routine maintenance of preexisting operations, public emergency activity}When is ground considered stabilized? {Ans: when vegetation is uniform, mature enough to survive, and will inhibit erosion.}VSMP authorities must ensure that SWM facilities, post-construction, are inspected at least once every ___ years, unless: {Ans: at least once every 5 years unless a certified personnel provides inspection reports at least once a year.}Virginia Runoff Reduction Method- method of load calculations {Ans: load calculations based on land cover type and soil type.}how long does VSMP authority have to review SWM plan? {Ans: 15 days to review and determine approval, and notify applicant.}Co-located practices {Ans: During construction, a facility functions for ESC, and is later constructed into a stormwater BMP.}How long must VSMP authority keep construction record drawings? {Ans: Until the relevant SWM facility is removed.}what is the site-based load limit for water quality? {Ans: 0.41 lbs/acre/yr total phosphorous}what term basically means a plea deal for stormwater offenders? {Ans: consent order, which replaces