CE 365: Construction Equipment and Methods HW 5 Loaders HW Assignment 5 HO: 3/8/22 DUE: 3/22/22 An excavator loader have a 3cy bucket is being considered for use on a project to excavate very hard clay with a swell factor of 35% from a borrow pit. The clay will be loaded into trucks having a loading height of 10 ft. The average cycle time for the excavator to load bucket, swing, dump, return is 20 second., The efficiency factor is equal to a 50-min hour? What is the estimated production of the excavator in cubic yards bank measure?Production3600qQxFE60minhiVolcorrectionQheapedcapacity3Fbucketfillfactor8090908090.85tcycletimeinseconds20Eefficiencyminperhour50Vo lCorrectionIt0.35360030.8518811tog283.33boyhr